
服務(wù)熱線電話
400-840-8766
水上樂園設(shè)施開業(yè)前做好兩方面的檢查
來源:http://979yy.cn/ 日期:2022-05-22 發(fā)布人:admin 瀏覽量:次
水上樂園開園前,除了做一些營銷活動和人員培訓(xùn)外,還要對園區(qū)內(nèi)的水上游樂設(shè)備進行一一檢查,水上樂園設(shè)施開業(yè)前做好兩方面的檢查相關(guān)內(nèi)容來講一講吧。
Before the opening of the water park, in addition to doing some marketing activities and personnel training, we should also check the water amusement equipment in the park one by one. Before the opening of the water park facilities, we should do a good job in two aspects. Let's talk about the relevant contents.
支撐架的檢查
Inspection of support frame
無涂層的鋼架需要每兩年進行一次檢查。焊接區(qū)域周圍的區(qū)域應(yīng)仔細檢查,必要時進行鍍鋅。如果發(fā)生生銹,請查找原因并多加注意。需要十年或更長時間進行全面、專業(yè)的檢查。
Uncoated steel frames need to be inspected every two years. The area around the welding area shall be carefully inspected and galvanized if necessary. If rust occurs, find out the cause and pay more attention. It takes ten years or more to conduct a comprehensive and professional inspection.
如果使用木結(jié)構(gòu)框架,目前很少使用。在每年一次的基礎(chǔ)上,不定期檢查其完整性、連接的牢固性等。使用不同設(shè)備的位置和環(huán)境條件會有很大差異,這會影響到上面提到的時間間隔。在一些腐蝕性環(huán)境中,如海邊或室內(nèi)安裝,間隔時間通常會縮短。
If wooden frame is used, it is rarely used at present. On the basis of once a year, irregularly check its integrity and connection firmness. The location and environmental conditions of different equipment will vary greatly, which will affect the time interval mentioned above. In some corrosive environments, such as seaside or indoor installation, the interval is usually shortened.
(1)混凝土樓梯和桌子,特別是樓梯每級臺階的前緣,需要定期檢查有無裂縫,金屬裝飾是否老化;
(1) Concrete stairs and tables, especially the leading edge of each step of the stairs, need to be regularly checked for cracks and whether the metal decoration is aging;
(2)焊接要經(jīng)常檢查,螺栓要擰緊;
(2) The welding shall be checked frequently and the bolts shall be tightened;
(3)檢查鉚釘是否牢固,是否腐蝕,檢查金屬板旁邊的水泥地板是否完好。
(3) Check whether the rivets are firm and corroded, and whether the cement floor next to the metal plate is intact.


電氣/機械系統(tǒng)檢查
Electrical / mechanical system inspection
每天要檢查電控柜和電機的接線是否牢固,有無進水、無潮。開機前先接通電源,檢查電源電壓等參數(shù)是否正常。檢查電機、水泵等轉(zhuǎn)動部位是否順暢,潤滑是否充分。還檢查了泵入口的屏蔽,以確保沒有結(jié)構(gòu)缺陷。
Check whether the wiring between the electric control cabinet and the motor is firm and whether there is water or moisture. Before starting the machine, turn on the power supply and check whether the power supply voltage and other parameters are normal. Check whether the rotating parts such as motor and water pump are smooth and whether the lubrication is sufficient. The shielding of the pump inlet was also checked to ensure that there were no structural defects.
每月檢查電氣控制柜上的電氣保護是否正常(如漏電保護開關(guān)),電路是否老化。檢查水泵與水管的連接處是否密封良好,安裝處是否松動。
Check whether the electrical protection on the electrical control cabinet is normal (such as leakage protection switch) and whether the circuit is aging every month. Check whether the connection between the water pump and the water pipe is well sealed and whether the installation is loose.
水上樂園設(shè)施廠家應(yīng)該每年應(yīng)檢查電氣設(shè)備的接地保護是否齊全有效,接地電阻是否符合相關(guān)標準的要求。電機、變壓器、開關(guān)按鈕、電氣設(shè)備電路的絕緣性能是否良好,絕緣值是否符合相關(guān)標準。
The facility manufacturer of water park shall check whether the grounding protection of electrical equipment is complete and effective and whether the grounding resistance meets the requirements of relevant standards every year. Whether the insulation performance of motor, transformer, switch button and electrical equipment circuit is good and whether the insulation value meets relevant standards.
水上樂園設(shè)施開業(yè)前做好兩方面的檢查相關(guān)信息便是這樣了,更多信息的詳細了解就來關(guān)注我們的網(wǎng)站979yy.cn吧!
We will pay more attention to the relevant information on the website of www.seaworld before the opening of the park Com!
相關(guān)新聞
- 室內(nèi)兒童水上樂園設(shè)備應(yīng)該要滿足什么需求?2023-03-18
- 水上滑梯設(shè)備在制作設(shè)計過程中的事項2023-03-17
- 水上樂園設(shè)備設(shè)計的要點有哪些?2023-03-16
- 水上樂園的衛(wèi)生工作又該如何開展2023-03-15
- 解析購置水上新型游樂設(shè)備的好處2023-03-14
- 使用兒童戲水設(shè)施前一定要先檢查設(shè)備情況!2023-03-13
- 水上滑梯設(shè)備的安全下滑方式2023-03-11
- 怎樣的游樂設(shè)備適合作為景點配套設(shè)施2023-03-10